Glossary
This glossary provides definitions for key terms and concepts used throughout the LIME Toolbox documentation.
Abbreviation |
Stands for |
Notes |
---|---|---|
ASD |
Analytical Spectral Devices - Instrument manufacturer |
Also refers to the instrument itself |
Cimel |
(Not an abbreviation) Instrument manufacturer |
Also refers to the instrument itself |
CSV |
Comma-Separated Values |
|
CLI |
Command Line Interface |
|
EO |
Earth Observation |
|
EO-CFI |
Earth Observation CFI Software |
|
ESA |
European Space Agency |
Project client |
FOV |
Field of View |
|
FR |
Functional Requirement |
|
GIRO |
GSICS Implementation of the ROLO Model |
|
GLOD |
GSICS Lunar Observation Dataset |
|
GSICS |
Global Space Based Inter-calibration System |
|
GUI |
Graphical User Interface |
|
KO |
Kick-off meeting |
|
LGLOD |
LIME-GLOD |
Former term, now deprecated |
LIME |
Lunar Irradiance Model of ESA |
|
MARD |
Mean Absolute Relative Difference |
|
MPD |
Mean Percentage Difference |
|
MRD |
Mean Relative Difference |
|
NFR |
Non-Functional Requirement |
|
NPL |
National Physical Laboratory |
Project partner |
OSF |
Orbit Scenario File |
|
ROLO |
RObotic Lunar Observatory |
|
SoW |
Statement of Work |
|
SRF |
Spectral Response Function |
|
TBX |
Toolbox |
|
TLE |
Three-Line Element Set |
Also known as 3LE |
TOA |
Top of Atmosphere |
|
UVa |
University of Valladolid |
Project partner |
VITO |
Vlaamse Instelling voor Technologisch Onderzoek; Flemish Institute for Technological Research |
Project partner |